Array ( [post_type] => pop-notice [posts_per_page] => -1 [orderby] => date [order] => DESC [post_status] => publish [paged] => 1 [meta_query] => Array ( [0] => Array ( [key] => end_date [value] => 20260817 [compare] => > [type] => NUMERIC ) ) )

Results: Master Programs (Health Sciences & Engineering)

03/01/2020

M. Pharm_1st_CP       M. Pharm_2nd_CP       M. Pharm_2nd_NPC       M. Pharm_3rd_CP

M. Pharm_3rd_NPC       M. Sc. Disaster_1st        M. Sc. Electrical_1st

M. Sc. Hydropower Engineering_1st      M. Sc. IWRM_1st       M. Sc. MM_1st

M. Sc. NRM_1st       M. Sc. Structure_1st       M. Sc. Structure_2nd

M. Sc. Structure_3rd       M. Sc.TEAM_1st       M.optometry_1st       M.Sc. MB_1st

 

NOTICE FOR RE-TOTALING/RE-CHECKING
The application for re-totaling and re-checking of answer sheets must be received by the Office of  the Controller of Examinations, Lekhnath, Pokhara by 07 January, 2020 (4:00 PM).
Next Articles
Array ( [post_type] => notice [posts_per_page] => 10 [orderby] => date [order] => DESC [post_status] => publish [paged] => 1 [post__not_in] => Array ( [0] => 24715 ) )